Camino Real Regional Mobility Authority
  • About CRRMA
  • Current Projects
  • Past Projects
  • Procurements
  • Meetings & Information
  • Contact
  • César Chávez Toll
  • Border West Expressway Toll
≡ × Menu Camino Real Regional Mobility Authority
  • CRRMA Overview
  • Meet the CRRMA
  • FAQ
  • Overview
  • César Chávez Express Toll Lanes
  • Border West Expressway Loop 375 Toll Lanes
  • SunCycle - El Paso Bike Share Program
  • 2008 Comprehensive Mobility Plan
  • Completed CRRMA Projects
  • Contact Us
  • Current Procurements
  • Past Procurements
  • Overview
  • El Paso Streetcar Project
  • Loop 375 - Americas Managed Lanes Project
  • 2013 Comprehensive Mobility Plan
  • Winn Road Project
  • Metropia Project
  • Current Board Meeting
  • Past Board Meetings
  • Past Committee Meetings
  • Publications and Resources
  • Agency Policies
  • Spur 601
  • Loop 375 at FM 659 (Zaragoza)
  • Americas Interchange Project
  • Spur 1966
  • Loop 375 Northeast
  • I-10 Airway Aesthetics

Completed CRRMA Projects

Americas Interchange Project

The Loop 375 at I-10 (Americas Interchange) Project included the design and construction of eight direct connectors and other related improvements for the Loop 375 (Joe Battle) and I-10 interchange:

  • Eastbound I-10 to northbound Loop 375;
  • Eastbound I-10 to Southbound Loop 375;
  • Westbound I-10 to northbound Loop 375;
  • Westbound I-10 to Southbound Loop 375;
  • Southbound Loop 375 to westbound I-10;
  • Southbound Loop 375 to westbound I-10;
  • Northbound Loop 375 to westbound I-10; and
  • Northbound Loop 375 to eastbound I-10.

Ultimately, the Americas Interchange will be a four level, fully directional interchange similar to the existing I-10 and US 54 interchange known locally as the Spaghetti Bowl. However, as the total funds necessary for the completion of the ultimate design were not originally available, the completion of the Americas Interchange was pursued in phases. The CRRMA managed the design-build component for the initial three direct connectors for this interchange, which were completed in 2013.

  • PHASE ONE: In 2005, the first phase opened to traffic, which consisted of the extension of the Loop 375 main lanes from North Loop Road to Bob Hope Drive. This first phase included the completion of the existing bridge over I-10 with all of its aesthetic improvements that serves as a welcoming site to the traveling public entering El Paso.
  • PHASE TWO: In 2013, the second phase opened to traffic, which consisted of the three direct connectors as described above.
  • PHASE THREE: The next phase will likely consist of the addition of one more direct connector bridge (westbound I-10 to northbound Loop 375). The region has been working to bring funding for this additional DC through a combination of funding sources. Initial plans for this next phase call for the CRRMA to provide the design work for the new bridge, while TxDOT would be charged with completing the construction.

The completion of the original 3 DCs is identified as Project #6 in the 2008 Comprehensive Mobility Plan.



Ultimate Design


Project Location Map


Resources

Project Whitepaper (05.06.09 – TxDOT Document)

stat
Region
stat
Bike Paths in Development
stat
Apps Related to El Paso Mobility
stat
Presidents' Conference Committee Streetcars
stat
CRRMA Board Members
stat
Years in Existence, and Counting
stat
Power-Generating Wind Turbines
stat
SunCycle Stations
stat
Mobility Projects Involving the CRRMA
stat
SunCycle Bikes Available

FAQ Disclaimers Español

Connect with CRRMA facebook twitter

Copyright © 2023 - CRRMA • A Hello Amigo Website

  • Home
  • About CRRMA
    • CRRMA Overview
    • Meet the CRRMA
    • FAQ
  • Current Projects
    • Overview
    • El Paso Streetcar Project
    • Loop 375 - Americas Managed Lanes Project
    • 2013 Comprehensive Mobility Plan
    • Winn Road Project
    • Metropia Project
  • Past Projects
    • Overview
    • César Chávez Express Toll Lanes
    • Border West Expressway Loop 375 Toll Lanes
    • SunCycle - El Paso Bike Share Program
    • 2008 Comprehensive Mobility Plan
    • Completed CRRMA Projects
  • Procurements
    • Current Procurements
    • Past Procurements
  • Meetings & Information
    • Current Board Meeting
    • Past Board Meetings
    • Past Committee Meetings
    • Publications and Resources
    • Agency Policies
  • Contact
    • Contact Us
  • César Chávez Toll
  • Make a Payment
  • Pay by Mail